How it works
From survey to switch-on, in five clear steps.
Every step says who does it and what we need from you. Timings depend on your site and your DISCOM, so we confirm them at the survey.
Site survey
We check the roof, shade, direction, your electricity connection and your bill.
System design
Panel layout, inverter size and structure, in a written proposal.
Installation
Structure, panels, inverter, wiring and protection are installed and tested.
Net-meter application
Application to your electricity distribution company (DISCOM), so surplus power is exported.
Service & monitoring
Monitoring, cleaning guidance and service when you need it.
Paperwork
Documents you’ll usually need
Requirements vary by DISCOM and scheme; we’ll give you the exact list at the survey.
- A recent electricity bill
- Proof of ownership of the property, or the owner’s consent
- Identity proof of the connection holder
- A cancelled cheque or bank details, where a subsidy applies
Ready for step one?
Book a site survey, or see a quick estimate first.
We reply to every enquiry within one working day.
